"We congratulate Rohan Builders (India) Pvt. Ltd. for achieving 2.05 Million safe man hours at Pune site, 0.58 Million at Chennai and 0.91 Million at Bhiwadi site till date. Rohan Builders India (P) Ltd. has vindicated the confidence put in them and we shall have no hesitation in recommending them as a good partner for any location / size of project with " Single Point Responsibility".
President - Tata BlueScope Steel Ltd.
   
“We are pleased to inform you that we have achieved a total of 2.5 Million manhours without lost time accident at our PROJECT TURBO as on 21st March 2005”. 
Colgate-Palmolive (India) Ltd. on achieving the above record for their Construction of Turbo Project at Baddi, Himachal Pradesh
   
“It is indeed appreciable that M/. Rohan Builders (India) Pvt. Ltd. contributed approximately 1.86 million Safe Working Hours, with approximately 900 manpower in peak days”. 
Hindustan Lever Ltd. on completion of Construction works for their Soaps, NSD, Pears Plant at Barotiwala, Himachal Pradesh.
   
“The construction works called for high quality of skills, apart from extremely tight completion schedule. We would like to place on record our full appreciation for the excellent performance put by M/s. Rohan Builders (India) Pvt. Ltd., in achieving targeted dates further Complete Project. The same needed resourcefulness and meticulous planning.” 
Hindustan Lever Ltd. on completion of Construction works for their Soaps, NSD, Pears Plant at Barotiwala, Himachal Pradesh.
   
“The organization at the site and the workmanship was of good standard and the whole work was completed to our satisfaction. We can, therefore, recommend M/s. Rohan Builders (India) Pvt. Ltd. for projects of large magnitude without reserve on the strength of their performances.” 
Fiat Engineering India Ltd. on completion of foundry of M/s. Teksid Kalyani Iron Foundry Ltd. at Goa.
   
“M/s. Rohan Builders (Pune) Pvt. Ltd. achieved the requisite progress inspite of interruption due to monsoon rains and their positive attitude towards the project enabled the handing over of Main Production Plant to the client for equipment erection in 78 days and overall completion in 4 months period as scheduled.” 
Tata Consulting Engineers for the project of M/s Tata Chuo Springs Pvt. Ltd.
   